¡¡Product name£º 600 type floor decking

600ĞÍÂ¥³Ğ°å


Product characteristic
Zinc plating steel plate goes through cold turn but is accomplished, as the steel floor with 0.8-1.5mm fever of favoring, bear combining with ready-made a overall with the reinforced bar loading 1) attractive looks pragmatic, the entirety designs 2) durable service , be easy to defend 3) extension convenient and rapid, economy high-effect 4) construction is convenient, time limit for a project 5 short) use is broad , price is substantial

 

Steel plate thickness Prop up condition load£¨kn/m2£©
0.5 1.0 1.5 2.0
0.6 Cantilever 1.9 1.5 1.3 1.2
Continuation 4.8 3.8 3.3 3.0
0.75 Cantilever 2.1 1.7 1.4 1.3
Continuation 5.4 4.3 3.7 3.4
1.0 Cantilever 2.3 1.8 1.6 1.4
Continuation 5.9 4.7 4.1 3.7
1.2 Cantilever 2.5 2.0 1.7 1.6
Continuation 6.4 5.1 4.4 4.0

The building building pressure section steel is indebted to board for adopt zinc plating steel plate after cold curved roll-in molding , is used as building holding board , also may be elected being mainly other use. Be board's turn to be used as building holding board, whose characteristic is that the rapid , convenient time limit for a project being under construction is short , saves a reinforced bar , is used for a steel form simultaneously, have cost of construction is low , the intensity is advanced characteristic.

The combination building undertakes the pulling a long of the order being under construction
The surface eliminates
(1) steel girder clean, the steel floor solders according to row territory on the steel girder;
(2) melting welding on the steel girder according to soldering procedure , steel being undertaken the pulling a long of;
(3) steel is indebted to the button among paper of for jointly getting along being used to clamp giving fixation;
(4) compound wind beam places fix scissors nails with the welding gun;
(5) pushes down the net designing that the gang of request pricks a reinforced bar;
(6) carries out concrete potting;


   