Chinese | English
Brand story | Technology | Products | Case shows | Service | Contact Us
body_02
Your current location£ºHome > Product general survey





   
Product listing
¡¡ C/Z purline
¡¡ Floor decking
¡¡ Overall project
¡¡ Steel structure
¡¡ Color steel tile
¡¡ Welded H beam
¡¡ Composite panel
¡¡ Rain resist covers
¡¡ Steel structure system
¡¡Product name£º  790 type floor deck

790ĞÍÂ¥³Ğ°å
Product characteristic
Zinc plating steel plate goes through cold turn but is accomplished, as the steel floor with 0.8-1.5mm fever of favoring, bear combining with ready-made a overall with the reinforced bar loading 1) attractive looks pragmatic, the entirety designs 2) durable service , be easy to defend 3) extension convenient and rapid, economy high-effect 4) construction is convenient, time limit for a project 5 short) use is broad , price is substantial


 

Steel plate thickness Prop up condition load£¨kn/m2£©
0.5 1.0 1.5 2.0
0.6 Cantilever 1.9 1.5 1.3 1.2
Continuation 4.8 3.8 3.3 3.0
0.75 Cantilever 2.1 1.7 1.4 1.3
Continuation 5.4 4.3 3.7 3.4
1.0 Cantilever 2.3 1.8 1.6 1.4
Continuation 5.9 4.7 4.1 3.7
1.2 Cantilever 2.5 2.0 1.7 1.6
Continuation 6.4 5.1 4.4 4.0

The building is indebted to paper of for undertaking the pulling a long of a production line in order important steel structure building supporting product our company introduces number bar iron , paper of type is advanced , complete ranges of specifications , price are substantial , has absolute advantage. In order much high-rise steel structure builds supporting service, product characteristic property as follows:
1, weight is light , the intensity is high , holds significant , anti-knock well;
2, the simplicity being under construction rapid , fights it out with to pretend to go to the lavatory;
3, substitutes tradition form board , improves the tradition form board shortcoming;
4, may bring down material as structure intensity part, cost;
5, be easy to match tendon , wiring , match construction of being in charge of;
6, outward appearance attractive looks clean and tidy;

The combination building undertakes the pulling a long of construction order
Outside
(1) steel girder is clear clean, the steel floor solders according to row board picture on the steel girder;
(2) melting welding on the steel girder according to soldering procedure , steel being undertaken the pulling a long of;
(3) steel is indebted to the button among paper of for jointly getting along using pliers to fix;
(4) compound wind beam places fix scissors nails with the welding gun;
(5) pushes down the net designing that the gang of request pricks a reinforced bar;
(6) carries out the concrete teeming


   
body_03
All rights reserved © Hebei Baofeng steel structure co.,ltd | Hebei ICP prepares the 8888th Technical support£ºXin Wang